EV Infrastructure
NERS Accredited ICP — EV Infrastructure

One Contractor.
End-to-End.
No DNO Delays.

We design, install and self-connect your EV charging infrastructure and substations — all under one roof. Full NERS accreditation means no waiting on the DNO.

Commercial Car Parks Public Chargepoints Depot & Fleet Substation Build Self-Connection
4-6 Wks
Faster Than DNO
NERS
Full Scopes
ICP
Accredited

Most EV providers can't deliver the full picture

Typical chargepoint operators provide hardware — but for electrical infrastructure they rely on the DNO, adding weeks of delay and a second contractor you can't control.

Typical EV Providers
Must go through DNO — weeks of delay
Cannot perform contestable works
Multiple contractors, multiple failures
No control over substation design
UK Power Connections
NERS accredited — self-connect
Full contestable + non-contestable works
One contractor, design to energisation
Substations built by our own team

Built for
Commercial Scale

From underground car parks to multi-storey retail destinations — we build the electrical backbone that makes large-scale EV charging possible.

🏢
Commercial Car Parks

End-to-end EV charging for retail and office destinations at any scale.

🔌
Public Chargepoints

On-street and destination charging for councils and public sector bodies.

Urban Charging Hubs

Designed for high-footfall areas — future-proofed capacity planning.

🚛
Workplace + Fleet

Depot and fleet infrastructure for commercial operators and councils.

🏛
Council + Public Sector

Borough-wide rollout capability with single fixed-price contracts.

⚙️
Substation Build

Ground-mounted to indoor units — civil works, switchgear and commissioning.

Our Capabilities

Everything Your EV
Infrastructure Needs

From feasibility to final energisation — the complete electrical backbone for your charging network, delivered by a single accredited team.

01
Network Design

Bespoke electrical network design for EV charging hubs, on-street infrastructure and commercial installations — engineered to your exact capacity requirements.

02
Substation Build + Install

Complete substation solutions from ground-mounted to indoor units. Civil works, switchgear, transformers and commissioning as a single package.

03
HV + LV Cable Networks

High and low voltage cable installation, jointing and testing. Coordinated civil engineering for trenching and duct routes.

04
Self-Connection + Energisation

As an ICP we perform our own grid connections — bypassing DNO queues entirely. Your project goes live weeks sooner.

05
Contestable Works

Cable laying, jointing, civil works and substation installation — all contestable elements delivered directly by us, not outsourced.

06
Project Management

Dedicated project management for local authority contracts. Compliance, wayleaves, permits and multi-site coordination handled as standard.

How It Works

From Brief to Live
Chargers in Four Steps

One point of contact. One programme. No waiting on the DNO.

1
Feasibility + Design

We assess your sites, model capacity requirements and produce a full network design — including substation specification and cable routes.

2
Civil + Electrical Build

Our in-house teams deliver all civil works, cable installation, jointing and substation construction. One contractor, fewer interfaces.

3
Self-Connection

As a NERS-accredited ICP, we connect directly to the distribution network. No DNO queue. No waiting. On your timeline.

4
Commissioning + Handover

Full testing, commissioning and documentation. We hand over a live, certified installation ready for your chargepoint operator.

Deliver Your EV Programme Faster + at Lower Cost

Whether deploying on-street chargers, building out depot charging, or planning a borough-wide rollout — our end-to-end capability means fewer contracts, fewer delays, and one accountable partner.

Get Free Infrastructure Assessment
Faster Timelines

Skip the DNO queue and cut 4-6 weeks from your programme

£
Cost Certainty

One fixed-price contract covering design through to energisation

Single Contact

One team, one programme, one accountable partner throughout

Proven at Scale

500+ connections delivered across residential, commercial and public sector

Request a Quote

Tell us about your project and we will come back with a tailored proposal — typically within 48 hours.

We will respond within 48 hours. No obligation, no hard sell.

Ready to get started?

Call us or email for a free consultation on your EV infrastructure project.